ABOUT THE PROJECT
Ascension Construction Solutions collaborated with the City of Columbus Department of Public Utilities to deliver a critical infrastructure upgrade in the northwest quadrant of Rickenbacker International Airport. This project involved the construction of new gravity sanitary sewers and the elimination of Pump Station SA-18, enhancing the area’s wastewater capacity to support current needs and future development.
The project included the installation of approximately 6,000 linear feet of 15”–24” sanitary sewers, with 1,700 linear feet constructed using trenchless (jack and bore) methods. This approach preserved critical roadway, railroad, and culvert infrastructure while avoiding disruptive open-cut construction. Additional complex components included the installation of 19 manholes ranging from 10 to 30 feet deep, five separate borings, and 33 well dewatering systems. To address future capacity needs, five tributary area alternatives were developed, each accounting for flow from Pump Station SA-18 and potential demand from Rickenbacker Airport and surrounding developable land.
Ascension Construction Solutions provided comprehensive project management, effective coordinating with multiple agencies such as CRAA, Pickaway County, CSX Railroad, the Army Corps, the City of Columbus Division of Water, and Earnhart Hill Regional Water & Sewer District. Utilizing technical expertise, our team conducted daily inspections, maintained detailed reporting, change management and project closeout, ensuring compliance with all standards and specifications.