ABOUT THE PROJECT
Ascension Construction Solutions (ACS), performed as Construction Manager at Risk of a Hyperscale Data Center Campus as part of a Tri-Venture. This Campus consists of four – 80MW data centers with a combined value of $1.26B. For the Data Center Campus project in Ohio, Ascension Construction Solutions is engaging in complex technical operations tailored for high-efficiency, which are essential for supporting vast digital ecosystems and AI/machine learning functions. This campus, includes highly specialized elements for environmental control, energy management, and robust security. Construction is highly modular which requires intense logistics management and clash coordination to facilitates extremely aggressive scheduling.
ACS performed project management, scheduling, engineering, safety, superintendent, QA/QC, lift director and workforce development.
The new data centers are 300,000 sf construction including the following components:
• 1.2M CY of mass grading, installation of storm, water, and sanitary utilities, road widening and additional traffic light.
• One low voltage and two medium voltage modular electric buildings, with prefabricated trestle conveyance.
• Thirty generators with a fuel oil system to provide backup power.
• Seven modular cooling plants with backup generators and electrical buildings. Air-cooled chillers, air-handling units.
Facility Support Area contains a kitchen, office space, kitting area, Disk erase area, restrooms, and loading docks.